aifollow.news Search
Back IT之家 科技新闻
IT之家 科技新闻· · Original publication time

Samsung Electronics plans to begin construction of its second Taylor fab in November 2026Machine translation

Automatically verified and published · Generated and evidence-checked automatically; not reviewed by a human.

AI-assisted summary

Jon Taylor, who oversees Samsung’s Austin and Taylor plants, confirmed that construction of Taylor’s second fab is planned for November 2026. The first fab remains on track to come online in 2026 and has entered equipment validation. He also said Elon Musk’s Terafab plan would not change the Tesla order deal.

Article · AI translation

IT Home reported on October 17 that, according to a report published on the 15th of this month, local time, by the Texas newspaper the Austin American-Statesman, Jon Taylor, head of Samsung’s Austin and Taylor plants, confirmed at a media event that construction of the second wafer fab (Fab 2) at the Taylor site is scheduled to begin in November 2026.

Jon Taylor also said that Taylor Fab 1 remains on track to come online in 2026. The fab has been installing equipment since this spring and has now entered the validation phase. Nearly all gas and chemical systems are currently in use, and installed equipment has begun operating.

The Samsung Electronics executive expressed gratitude for Tesla’s order and said Elon Musk’s Terafab plans would not change the deal.

References

https://www.statesman.com/business/technology/article/samsung-taylor-ai-chip-demand-22475945.php

Advertising disclosure: External links in this article, including but not limited to hyperlinks, QR codes and access codes, are provided to convey more information and save readers time in choosing what to read. The resulting information is for reference only. All IT Home articles containing external links include this disclosure.

Found an error? Send a correction