aifollow.news Search
Back IT之家 科技新闻
IT之家 科技新闻· · Original publication time

Oracle reportedly trucks natural gas to power data centers temporarilyMachine translation

Automatically verified and published · Generated and evidence-checked automatically; not reviewed by a human.

AI-assisted summary

Bloomberg reports that Oracle is trucking natural gas to meet data center energy needs before supporting pipelines are built, aiming to bring computing capacity online sooner. The approach has been used at a Utah data center for more than a year and is being introduced at the Shackelford data center in Texas, which Oracle is developing for OpenAI. The reported end-to-end cost is about four times that of delivery through a major pipeline hub.

Article · Original

The article text is unavailable in this language; an existing version is shown.

IT之家 10 月 9 日消息,彭博社当地时间昨日报道称,Oracle(甲骨文)正通过卡车转运天然气的方式在配套燃气管网建成前临时性地满足数据中心的能源需求,以加速算力容量的上线。

报道指出 Oracle 已在犹他州的一座数据中心使用该方案长达一年有余,还在为 OpenAI 开发的得克萨斯州 Shackelford 数据中心导入了这一策略,并有可能扩展到新墨西哥州的 "Project Jupiter" 大型项目。

由于电力基础设施建设耗时漫长,美国大量数据中心正转向表后供电乃至自建燃气发电设施,但天然气管线的布设也需要得到一系列审批许可。

卡车转运天然气需要经历导出-压缩-运输-减压-释放等多个步骤,全流程成本大约是经由大型管道枢纽输送的 4 倍。单一车次能输送的燃气量也相当有限:每辆大型拖车所运输的天然气只够 100MW 数据中心运行 40 分钟。

Found an error? Send a correction